SOLIDS CONTROL / FLUID RECOVERY / REPLACEMENT SCREENSsales@oilfieldscreens.com
01 / SCREENING

Scomi Prima 3G / 4G / 5G Shaker Screens

Separate Prima 3G, 4G and 5G requirements by the actual machine generation and installed screen reference.

Request a quotation Selection details ↓
Scomi Prima 3G / 4G / 5G Shaker Screens catalogue reference image
Catalogue reference image. Confirm the offered model and configuration in the quotation.
TECHNICAL ENQUIRY BASIS

What to specify for Scomi Prima 3G / 4G / 5G Shaker Screens

A useful quotation starts with the installed equipment or process requirement. Provide the following information so the offered scope can be checked against the duty.

Selection itemInformation to provide
Identification & configurationExact equipment and deck: Scomi Prima 3G / 4G / 5G
Operating or panel detailsExisting screen part number and API designation
Interfaces & performanceMeasured panel geometry, frame and attachment
Supply requirementQuantity, destination and required delivery date

Application and configuration

A page covering several generations is not an interchangeability statement. Confirm the panel drawing and attachment details for each machine.

For an existing machine, record the screen marking before removing it. Photograph the panel face, underside and attachment features. The same API designation on two panels does not establish that the panels fit the same shaker.

State whether original OEM supply or an independently manufactured replacement is acceptable. Any proposed alternative should identify its manufacturer, compatible equipment reference and supporting dimensional or test information.

Selection considerations

An API screen designation describes a tested separation range; mesh count alone does not establish an equivalent screen.

Physical fit depends on the panel geometry, support, seals and locking or tensioning arrangement. A familiar model name is only the starting point.

Compare documented conductance, non-blanked area, service conditions and replacement cost together. No single screen is best for every mud program.

Details that help the technical review

  • Shaker manufacturer, exact model and deck position
  • Current part number, panel length, width and attachment profile
  • API designation, screen construction and supporting test data
  • Mud type, quantity, destination and required delivery date

Compare the complete quotation

CheckConfirm before ordering
Supply identityOffered manufacturer, model, origin and OEM or replacement basis.
Technical scopeApproved drawing, duty or panel reference, included accessories and exclusions.
DocumentationApplicable test information, material documentation, manuals and certificates for the offered configuration.
DeliveryQuantity, destination, packing, shipping basis and confirmed lead time.
Operating supportWear parts, recommended spares, maintenance requirements and warranty terms.

Price, availability, performance and delivery are confirmed against the actual enquiry. Catalogue coverage does not imply stock, OEM authorisation or a certified performance result.

Prepare an RFQ for this item

Common buying questions

Can I enquire without the complete specification?

Yes. Send the model, existing reference, photographs or process description you have. Identify any unknown details so they can be resolved before order.

Are the pictures a specification of the offered equipment?

No. Images are catalogue references. The quotation and approved technical documents define the equipment, configuration and supply basis.

What determines the final price and lead time?

Configuration, quantity, documentation, origin, packing and delivery destination all affect the offer. Include the required date and any mandatory project conditions in the RFQ.

Technical references

References explain equipment or terminology. They do not establish that an offered replacement is OEM-made, endorsed or certified.

A BETTER ENQUIRY. A CLEARER QUOTATION.

Have a model, a part number
or a process requirement?

Send what you have. Include quantity, delivery destination and the operating duty.

Prepare your RFQ