What to specify for Brandt VSM 300 Primary Shaker Screens
A useful quotation starts with the installed equipment or process requirement. Provide the following information so the offered scope can be checked against the duty.
| Selection item | Information to provide |
|---|---|
| Identification & configuration | Exact equipment and deck: Brandt VSM 300 Primary |
| Operating or panel details | Existing screen part number and API designation |
| Interfaces & performance | Measured panel geometry, frame and attachment |
| Supply requirement | Quantity, destination and required delivery date |
Application and configuration
NOV identifies four primary screens in the standard VSM 300 deck arrangement. A replacement enquiry should state primary explicitly; scalping and drying screens are separate references.
VSM 300 deck identification
| Deck | Screen positions | Enquiry distinction |
|---|---|---|
| Scalping | 3 | Top-stage panel reference; identify separately from primary. |
| Primary | 4 | Main fine-screening panel reference. |
| Optional drying | 2 | Confirm the fitted drying arrangement and its own panel reference. |
Deck counts are from NOV’s published VSM 300 configuration. Check the installed machine and any modifications. View the manufacturer reference.
For an existing machine, record the screen marking before removing it. Photograph the panel face, underside and attachment features. The same API designation on two panels does not establish that the panels fit the same shaker.
State whether original OEM supply or an independently manufactured replacement is acceptable. Any proposed alternative should identify its manufacturer, compatible equipment reference and supporting dimensional or test information.
Selection considerations
An API screen designation describes a tested separation range; mesh count alone does not establish an equivalent screen.
Physical fit depends on the panel geometry, support, seals and locking or tensioning arrangement. A familiar model name is only the starting point.
Compare documented conductance, non-blanked area, service conditions and replacement cost together. No single screen is best for every mud program.
Details that help the technical review
- Shaker manufacturer, exact model and deck position
- Current part number, panel length, width and attachment profile
- API designation, screen construction and supporting test data
- Mud type, quantity, destination and required delivery date
Compare the complete quotation
| Check | Confirm before ordering |
|---|---|
| Supply identity | Offered manufacturer, model, origin and OEM or replacement basis. |
| Technical scope | Approved drawing, duty or panel reference, included accessories and exclusions. |
| Documentation | Applicable test information, material documentation, manuals and certificates for the offered configuration. |
| Delivery | Quantity, destination, packing, shipping basis and confirmed lead time. |
| Operating support | Wear parts, recommended spares, maintenance requirements and warranty terms. |
Price, availability, performance and delivery are confirmed against the actual enquiry. Catalogue coverage does not imply stock, OEM authorisation or a certified performance result.
Prepare an RFQ for this itemCommon buying questions
Can I enquire without the complete specification?
Yes. Send the model, existing reference, photographs or process description you have. Identify any unknown details so they can be resolved before order.
Are the pictures a specification of the offered equipment?
No. Images are catalogue references. The quotation and approved technical documents define the equipment, configuration and supply basis.
What determines the final price and lead time?
Configuration, quantity, documentation, origin, packing and delivery destination all affect the offer. Include the required date and any mandatory project conditions in the RFQ.
Technical references
References explain equipment or terminology. They do not establish that an offered replacement is OEM-made, endorsed or certified.



